The following studies were carried out by the design office, autonomously or in collaboration with other agencies:
 
Α/Α STUDY CLIENT YEAR OF COMMISSION YEAR OF COMPLETION DESIGN STAGES
ΝΟΣΗΛΕΥΤΙΚΑ ΙΔΡΥΜΑΤΑ - ΕΡΓΑΣΤΗΡΙΑ
1 DESIGN, CONSTRUCTION (ARCHITECTURAL, STRUCTURAL AND E/M) AND EQUIPMENT, ELEFSINA REGIONAL HOSPITAL IMPREGILO S.p.A 1989 1990 F-D
2 DESIGN, CONSTRUCTION (ARCHITECTURAL, STRUCTURAL AND E/M) AND EQUIPMENT, REGIONAL UNIVERSITY GENERAL HOSPITAL OF LARISSA IMPREGILO S.p.A 1991 1995 F-D
3 NEW GENERAL HOSPITAL OF GREVENA – CAPACITY: 100 BEDS MINISTRY OF HEALTH AND WELFARE 1989 1996 P-F-D-T
4 DESIGN, CONSTRUCTION OF BUILDING – E/M WORKS AND PROCUREMENT AND INSTALLATION OF BASIC MEDICAL EQUIPMENT FOR THE NEW CHANIA GENERAL HOSPITAL CONSORTIUM IMPREGILO S.p.A – METRON SA – TERNA SA 1994 1997 F-D
5 DESIGN, CONSTRUCTION (ARCHITECTURAL, STRUCTURAL AND E/M) AND EQUIPMENT, SERRES PREFECTURAL GENERAL HOSPITAL CONSORTIUM SERRES HOSPITAL ALTE SA – IDEAL MEDICAL PRODUCTS S.A. 1996 1998 F-D
6 GENERAL UNIVERSITY HOSPITAL OF ALEXANDROUPOLIS TEAM E-M Ltd 1997 1999 F-D
7 DETAILED DESIGN OF ARCHITECTURAL, STRUCTURAL AND E/M INSTALLATIONS, CENTRAL PUBLIC HEALTH LABORATORY- NATIONAL CENTER FOR HEALTH RESEARCH BUILDING IMPREGILO S.p.A 1998 2003 P-F-D-T
8 UNIVERSITY GENERAL HOSPITAL “ATTIKON”, WEST ATTICA DEPANOM SA 2003 2004 P
9 DESIGN AND CONSTRUCTION OF BUILDING – E/M WORKS AND PROCUREMENT OF MEDICAL AND HOTEL EQUIPMENT, GENERAL HOSPITAL OF KAVALA INSO S.p.A 2003 2008 P-F-D
10 CONSTRUCTION OF NEW BUILDING – MODERNIZATION OF EXISTING INFRASTRUCTURE AND PROCUREMENT OF EQUIPMENT, CHIOS GENERAL HOSPITAL “SKYLITSION” AKTOR SA – SOCIETE FRANCAISE D’ EQUIPMENT HOSPITALIER SA 2003 2008 F-D
11 DESIGN AND CONSTRUCTION OF BUILDING – E/M INSTALLATIONS AND PROCUREMENT – INSTALLATION OF MEDICAL AND HOTEL EQUIPMENT, ZAKYNTHOS PREFECTURAL GENERAL HOSPITAL INSO S.p.A 2004 2008 D
12 ADDITION OF A FIVE-STOREY BUILDING OF NURSING UNITS AT THE UNIVERSITY HOSPITAL OF IOANNINA (UHI) MINISTRY OF HEALTH & SOCIAL SOLIDARITY (MHSS) 2008 2009 P-F-D-T
13 CONSTRUCTION OF NEW WING OF E.R. AND I.C.U. OPERATING ROOMS, GENERAL HOSPITAL OF PATRAS AGIOS ANDREAS JOINT VENTURE KASTOR SA – P.&C. DEVELOPMENT SA 2007 2009 F-D
14 DESIGN, CONSTRUCTION AND E/M WORKS, PROCUREMENT AND INSTALLATION OF MEDICAL AND HOTEL EQUIPMENT, SANTORINI GENERAL HOSPITAL DEPANOM SA 2008 2010 D
15 NEW GEORGE AND MARIA VERGOTIS WING AT THE GENERAL HOSPITAL OF KEFALONIA GEORGE AND MARIA VERGOTIS FOUNDATION 2010 2012 P-F-D-T
CULTURAL – CONVENTION – EXHIBITION CENTRES
1 DESIGN – CONSTRUCTION OF CULTURAL CENTRE AND THEATRE MONI LAZARISTON HELLENIC TECHNODOMIKI SA 1996 1997 F-D
2 COMPLETE CONSTRUCTION OF THE UNDERGROUND SPACES OF THE BUILDING COMPLEX “THOLOS” – “THEATRON”, INCLUDING THE BASEMENT AREAS OF THE ATRIUM, THE FLOOR AT GROUND LEVEL, AND THE FULL SUPERSTRUCTURE CONSTRUCTION OF THE PROJECT “THOLOS”– WORKS DEPARTMENT PERTAINING TO THE UNDERGROUND SPACES OF THE PROJECT “THEATRON” - “THOLOS”, FROM THE BASEMENT AREAS OF THE ATRIUM TO THE GROUND LEVEL FLOORS OF THE FOUNDATION OF THE HELLENIC WORLD AKTOR SA. 2005 2005 D
3 LYRICAL THEATRE OF CORFU AENAK SA 2005 2006 P-F-D-T
4 CONVERSION OF BADMINTON BUILDING TO CULTURAL CENTER (BADMINTON THEATRE) ATHENS BADMINTON CULTURAL DEVELOPMENT SA of CULTURAL DEVELOPMENT 2006 2007 F-D
5 COMPLETION OF MEGARON ATHENS CONCERT HALL – STAGE B, ELECTROMECHANICAL - EQUIPMENT JOINT VENTURE TERNA SA – AKTOR SA. – J&P AVAX SA 1998 2008 F-D
6 CONSTRUCTION OF KOMOTINI CONVENTION AND CULTURAL CENTER – STAGE A KASTOR SA 2006 2008 F-D
7 RESTORATION OF PIRAEUS MUNICIPAL THEATER TOMI SA 2008 2012 P-F-D
INFRASTRUCTURE PROJECTS
1 DESIGN – CONSTRUCTION OF STAGE B, PSITALIA BIOLOGICAL SEWAGE THEMELIODOMI SA – HELLENIC TECHNODOMIKI SA – ATHENA SA - PASSAVANT MACHINENTECHNIK GmbH - GIOVANNI PUTIGNANO & FIGLI S.r.l 1997 1997 DESIGN OFFER
2 RESTORATION – DEVELOPMENT OF CAMPING AREA AT AGYIA SWAMP MUNICIPALITY OF PATRAS 2005 2010 P-F-D
EDUCATION BUILDINGS
1 DESIGN – CONSTRUCTION OF KOMOTINI POLICE ACADEMY HELLENIC TECHNODOMIKI SA 1996 1997 F-D
2 DESIGN – CONSTRUCTION (ARCHITECTURAL, STRUCTURAL AND E/M) OF COMPLETION OF BUILDINGS & AMPHITHEATRES FOR THE MATHEMATICS DEPARTMENT, CONSTRUCTION OPERATIONS & INSTALLATIONS JOINT VENTURE ENTECHNOS SA – ERETVO SA 1996 1998 F-D
3 DESIGN – CONSTRUCTION (ARCHITECTURAL, STRUCTURAL AND E/M) OF COMPLETION OF SECTION V AND AMPHITHEATRE I OF THE IT DEPARTMENT FOR THE FACULTY OF SCIENCE BUILDINGS (BUILDING OPERATIONS AND E/M INSTALLATIONS) JOINT VENTURE ENTECHNOS SA – ERETVO SA – MELKA SA 1996 1998 F-D
4 BUILDING DESIGN FOR THE ECONOMICS DEPARTMENT UNIVERSITY OF PATRAS 2008 2011 P-F-D-T
SPORTS FACILITIES
1 “HOUSE” OF WEIGHTLIFTING GENERAL SECRETARIAT OF SPORTS 1999 2000 P-F-D-T
2 OLYMPIC TENNIS CENTER IN OAKA - COMPLETION AKTOR SA 2001 2001 D/C-F
3 TOTAL DESIGN AND DEVELOPMENT AND VARIOUS NECESSARY STUDIES AND RESEARCH FOR THE CONSTRUCTION OF OLYMPIC FACILITIES FOR THE MODERN PENTATHLON, BADMINTON, THE REFORMATION AND NECESSARY INFRASTRUCTURE WORKS AT THE OLYMPIC COMPLEX IN GOUDI SPECIAL SERVICES OF PUBLIC WORKS (EYDE) SA 2004 2001 2002 P-F-D-T
4 OAKA OLYMPIC STADIUM: RESTORATION – RENOVATION WORKS ERETVO SA 2003 2004 F-D
5 INDOOR GYMNASIUM BUILDING – KOMOTINI POLICE ACADEMY SHOOTING RANGE DEPARTMENT OF PUBLIC WORKS, REGIONAL BRANCH OF EASTERN MACEDONIA AND THRAKI 2004 2009 P-F-D-T
6 “SERAFEIO” SWIMMING AND CULTURAL CENTRE ERETVO SA 2006 2010 F-D
AIRPORTS
1 DESIGN – CONSTRUCTION OF SOUTHERN DEPARTMENT AT SMAEK BUILDING IN TATOI (ΜΤ-331Ε) HELLENIC AIR FORCE CONSTRUCTIONS AGENCY (YPEPA) 2000 2001 P-F-D-T
2 CONSTRUCTION OF AIRCRAFT REPAIR AND MAINTENANCE FACILITIES (HANGAR) AT THE NEW INTERNATIONAL AIRPORT IN SPATA CONSORTIUM HELLENIC TECHNODOMIKI SA – AEGEK – AKTOR SA 2000 2001 F-D
3 DESIGN – CONSTRUCTION INTERMODAL FREIGHT CENTRE OF THESSALONIKI CONSORTIUM EMPEDOS – ANASTILOTIKI SA – ALTEC SA 2003 2003 D
4 TERMINAL BUILDING EXPANSION, VARIOUS AUXILIARY INSTALLATIONS AND REMODELING OF THE SURROUNDING AREA, KOS INTERNATIONAL AIRPORT HIPPOCRATES (KGS) CIVIL AVIATION AUTHORITY 2004 2008 P-F-D-T
COMMERCIAL COMPLEXES – RETAIL STORE BUILDINGS
1 NEW COMMERCIAL COMPLEX BUILDING AND UNDERGROUND PARKING ON P. RALLIS STREET 255 AG. IOANNIS RENTIS AKTOR SA 2003 2003 P-F-D
OFFICE BUILDINGS – INDUSTRIAL BUILDINGS
1 REGIONAL CENTRE OF QUALITY CONTROL, CLASSIFICATION AND STYLIZATION (KARDITSA) MINISTRY OF AGRICULTURE 1997 2000 P-F-D
2 INTERNATIONAL BROADCASTING CENTER (IBC) WITH UNDERGROUND PARKING HELLENIC TECHNODOMIKI & ATHENA SA 2001 2001 D/C-F
3 BUILDING OF PRODUCTION LINE OF COMPLEX MATERIALS – HELLENIC AEROSPACE INDUSTRY (HAI) AKTOR SA 2005 2005 P-F-D
4 CONSTRUCTION OF NEW CENTRAL OFFICES BUILDING FOR TSMEDE (P.P. GERMANOU 3-5) AND RESTORATION – REPAIR OF THE EXISTING (KOLOKOTRONI 4) TOMI SA 2010 2013 F-D-T
HOTELS – TOURISM FACILITIES
1 CONSTRUCTION OF NEW SECTION AND RESTORATION OF SECTION UNDER PRESERVATION OF HOTEL CASINO COMPLEX MON PARNES, REPLACEMENT OF EXISTING COMPLEX FACILITIES LDK ΣΥΜΒΟΥΛΟΙ ΜΗΧΑΝΙΚΟΙ Α.Ε. 2010 - P-F-D
SETTLEMENTS - HOUSES
1 DESIGN AND PLANNING OF 150 NEW 60m2 APARTMENTS FOR THE EARTHQUAKE STRICKEN IN AGIOS DIONYSIOS, DRAPETSONA CONSORTIUM ENTECHNOS SA – K. KOURTIDIS SA 2005 2006 F-D
RAILWAY STATIONS
1 STUDY TO IMPROVE THE OPERATION OF THE BORDER STATION PYTHION OSE SA 2002 2004 P-F-D-T
2 STUDY TO REFORM THE RAILWAY STATIONS (R.S.) LIANOKLADI AND DOMOKOS AND STUDY OF NEW R.S. AGIOS STEFANOS OF THE NEW DOUBLE TRACK RAILWAY LINE LIANOKLADI - DOMOKOS ERGOSE SA 2004 2007 P-F-D-T



Legend:

P: Preliminary / Draft Design

F: Final Study

D: Detailed Design

T: Tender Documents

D/C: Design & Construction